Eric J. Klein , Ph.D. , P.E. , PMP , CCP
Process Plant Terminology Part 5: Mass Transfer Processes
This post discusses mass transfer processes. It is part of a series that describes process engineering terminology.
Dr. Klein is a Vice President of Long International. He has over 20 years of industrial experience as a Technical Leader, Project Manager, and Consultant in engineering, procurement, and construction (EPC), manufacturing, and research and development (R&D) environments. Dr. Klein is skilled in corporate leadership and has significant experience leading cross-functional teams to design, build, commission, start up, and test chemical processing systems in the power generation and semiconductor manufacturing industries.
He possesses project management experience for multimillion dollar capital projects including earned value management, risk management, contract and scope of work negotiation, technical project proposals, cost estimating, change control, requests for information (RFI), change order management, design management, and equipment procurement oversight. He has broad knowledge of emissions control, including carbon capture, for the oil and gas and power generation industries. Prior to joining Long International, Dr. Klein held the positions of Chief Technology Officer, Vice President of Chemical Systems, Director of Chemical and Process Engineering, Staff Technologist, and Senior Process Engineer.
Ph.D., Chemical Engineering, University of Colorado, 2000
M.E., Chemical Engineering, Stevens Institute of Technology, 1997
B.E., Chemical Engineering, Stevens Institute of Technology, 1995
Registered Professional Engineer, Colorado (No. 52404)
Project Management Professional (PMI, No. 2164131)
Certified Cost Professional (AACE International, No. CCP-5573)
American Institute of Chemical Engineers (AIChE)
International Society of Automation (ISA)
Association for the Advancement of Cost Engineering International (AACE International)
Project Management Institute (PMI)
Society of Construction Law – North America (SCL-NA)
Contact Us
" " indicates required fields
Eric J. Klein , Ph.D. , P.E. , PMP , CCP
This post discusses mass transfer processes. It is part of a series that describes process engineering terminology.
Eric J. Klein , Ph.D. , P.E. , PMP , CCP
This post discusses heat transfer processes. It is part of a series that describes process engineering terminology.
Eric J. Klein , Ph.D. , P.E. , PMP , CCP
This post discusses fluid flow processes. It is part of a series that describes process engineering terminology.
Eric J. Klein , Ph.D. , P.E. , PMP , CCP
This blog post defines process engineering terminology commonly encountered when describing industrial processes and associated equipment.
Eric J. Klein , Ph.D. , P.E. , PMP , CCP
This post provides an overview of the various drawing types that are used to depict industrial processing and manufacturing plants.
Eric J. Klein , Ph.D. , P.E. , PMP , CCP
This post describes scenarios where engaging a chemical engineer as an expert witness can significantly benefit the outcome of a case.
Eric J. Klein , Ph.D. , P.E. , PMP , CCP
This post discusses the typical chemical engineer’s training and expertise and the role of a chemical engineer as an expert witness.
Eric J. Klein , Ph.D. , P.E. , PMP , CCP
This post explores three flue gas desulfurization process flows and associated chemistries as applied to coal-fired power plants.
Eric J. Klein , Ph.D. , P.E. , PMP , CCP
This post provides high-level overviews of FGD technologies with respect to sulfur dioxide capture applications at coal-fired power plants.
Eric J. Klein , Ph.D. , P.E. , PMP , CCP
This post provides overviews of sulfur dioxide pollution and emissions regulations, the FGD industry, and global FGD market trends.
Andrew Avalon , P.E. , PSP , Richard J. Long , P.E. , P.Eng. , Eric J. Klein , Ph.D. , P.E. , PMP , CCP
This post outlines how construction insurance claims advisors can assist insurance companies and insured project owners.
Richard J. Long , P.E. , P.Eng. , Andrew Avalon , P.E. , PSP , Eric J. Klein , Ph.D. , P.E. , PMP , CCP
This is the second post in a two-part series on the role and benefit of a construction consultant.
Richard J. Long , P.E. , P.Eng. , Eric J. Klein , Ph.D. , P.E. , PMP , CCP
This is the first post in a two-part series on the role and benefit of a construction consultant.
Richard J. Long , P.E. , P.Eng. , Eric J. Klein , Ph.D. , P.E. , PMP , CCP
This is the second post in a two-part series that discusses best practices for avoiding claims and disputes on construction projects.
Richard J. Long , P.E. , P.Eng. , Eric J. Klein , Ph.D. , P.E. , PMP , CCP
This is the first post in a two-part series that discusses best practices for avoiding claims and disputes on construction projects.
Eric J. Klein , Ph.D. , P.E. , PMP , CCP
This is the final post in a six-part series that discusses carbon capture, utilization, and sequestration.
Eric J. Klein , Ph.D. , P.E. , PMP , CCP
This is the fifth post in a six-part series that discusses carbon capture, utilization, and sequestration.
Eric J. Klein , Ph.D. , P.E. , PMP , CCP
This is the fourth post in a six-part series that discusses carbon capture, utilization, and sequestration.
Eric J. Klein , Ph.D. , P.E. , PMP , CCP
This is the third post in a six-part series that discusses carbon capture, utilization, and sequestration.
Eric J. Klein , Ph.D. , P.E. , PMP , CCP
This is the second post in a six-part series that discusses carbon capture, utilization, and sequestration.
Eric J. Klein , Ph.D. , P.E. , PMP , CCP
This is the first post in a six-part series that discusses carbon capture, utilization, and sequestration.
Our experts are ready to help.
Our extensive international experience includes large, complex, grass roots, revamp, and reconstruction projects incorporating conventional-phased, fast-track, and EPC turnkey concepts.