ArizonaOn behalf of a design firm, evaluated the technical validity and associated damages associated with alleged defective engineering and equipment design for the Pinal Energy Ethanol Plant Project.
Archive
On behalf of a design firm, evaluated the technical validity and associated damages associated with alleged defective engineering and equipment design for the Pinal Energy Ethanol Plant Project.
On behalf of a design firm, evaluated the technical validity and associated damages associated with alleged defective engineering and equipment design for the Pinal Energy Ethanol Plant Project.
On behalf of an owner, analyzed change order claims alleged by an EPC contractor on an ethanol from corn project at an old brewery site.
On behalf of an owner, reviewed schedule acceleration and delays associated with the construction of an ethanol plant. Issues involved force majeure, changed site conditions, and defective work by an EPC contractor.