Analyzed an owner’s errors and omissions claim against the design contractor on a condensate plant project.

Refineries, Petrochemical, and Chemical

Colorado

Analyzed an owner’s errors and omissions claim against the design contractor on a condensate plant project.

Refineries, Petrochemical, and Chemical

Texas

Prepared damages and schedule analyses in support of an owner’s defense against a contractor’s $5 million delay and disruption claim on a fast-track CO2 recovery process plant facility.

Refineries, Petrochemical, and Chemical

Iraq

On behalf of a Japanese EPC contractor, prepared a claim, developed a document database, and analyzed costs and schedules for a $450 million fertilizer plant. Prepared a $100 million claim against the owner, which was abandoned as a result of the Gulf War. Successfully negotiated one Turkish and two Korean subcontractors’ claims against the Japanese prime contractor.

Refineries, Petrochemical, and Chemical

Jordan

On behalf of an EPC contractor, analyzed the technical entitlement of over 400 change orders associated with an engineering and construction contractor’s $60 million claim on a magnesium oxide production plant. Determined the cause-effect relationships among the changed work and the resulting schedule impact and additional costs. Provided expert testimony at an ICC arbitration hearing in London. The contractor alleged that the FIDIC-based contract provided relief under the Variations clause. However, the owner argued that it was a fixed price contract, and no relief was available. Also analyzed the cause-effect relationship of improper operation by the owner and resulting poor magnesium oxide production from the facility.

Refineries, Petrochemical, and Chemical

Trinidad

Performed schedule delay and change order analysis in support of an owner’s defense of a $10.5 million claim on upgrades to piping, boiler and flare facilities in a major international oil refinery.

Refineries, Petrochemical, and Chemical

Texas

On behalf of an EPC contractor, analyzed delays and time extension entitlement on a $75 million claim by the mechanical subcontractor involving the procurement materials and installation of process plant equipment and piping on a major petrochemical plant.