On behalf of a drywall and painting subcontractor, provided analysis and quantification of schedule delay, labor productivity loss, and other damage resulting from change orders on a commercial facility in Colorado. Prepared and submitted an expert report. Parties settled prior to arbitration.

Building Construction

Colorado

On behalf of a drywall and painting subcontractor, provided analysis and quantification of schedule delay, labor productivity loss, and other damage resulting from change orders on a commercial facility in Colorado. Prepared and submitted an expert report. Parties settled prior to arbitration.

Mining and Mineral Processing

Colorado

On behalf of a prime contractor, provided technical, scheduling, loss of productivity, and damages analyses in regard to a $30 million dispute related to the engineering and construction of a high-grade gold processing facility. Prepared the prime contractor's claim, reviewed and prepared a pass-through claim for the mechanical subcontractor, and evaluated the owner's counterclaim. Evaluated the status of design at contract award, the quality of owner-supplied equipment, the accuracy of the contractors' bid estimates, and the responsibility and impact of numerous design and construction changes as well as other issues. Evaluated and apportioned responsibility for delay, disruption, and damages among multiple parties. Quantified disruption resulting from cold-weather work, overtime, crowding, shift work, and the cumulative impact of changes. The parties settled prior to court proceedings.

Transportation

Colorado

Assisted an owner’s construction manager in the analysis of schedule delay and productivity loss claims submitted by a design-build contractor for the engineering and construction of a roadway project in Colorado. Parties settled prior to arbitration.

Building Construction

Colorado

On behalf of an electrical contractor, evaluated cost overruns resulting from change orders and extra work claims on a training facility at Fort Carson Air Force Base.

Building Construction

Colorado

On behalf of an electrical contractor, reviewed the validity of backcharge claims alleged by a general contractor. Prepared a report to facilitate settlement of the claims.

Pipelines and Utilities

Colorado

Analyzed an electrical and instrumentation subcontractor’s claim on behalf of an EPC contractor regarding a compressor station project. Assessed allegations of schedule impact and acceleration and prepared an expert report that challenged the claims made by the subcontractor’s expert.