Building Construction
KuwaitPrepared a $45 million claim including delay analysis and damages calculations for an Italian construction firm that constructed two hospitals.
Archive
Prepared a $45 million claim including delay analysis and damages calculations for an Italian construction firm that constructed two hospitals.
Prepared a $45 million claim including delay analysis and damages calculations for an Italian construction firm that constructed two hospitals.
On behalf of a Japanese EPC contractor, prepared a claim, developed a document database, and analyzed costs and schedules for a $450 million fertilizer plant. Prepared a $100 million claim against the owner, which was abandoned as a result of the Gulf War. Successfully negotiated one Turkish and two Korean subcontractors’ claims against the Japanese prime contractor.
On behalf of an owner, analyzed schedule delay claims by a prime contractor on an LNG facility being constructed.
Performed project management audits of a gas-to-liquids facility to assist with evaluating the outstanding engineering and construction scope, assess restructuring of the project management team, and assist with the development of a Request for Proposal for the selection of a project management contractor.
Performed schedule delay and change order analysis in support of an owner’s defense of a $10.5 million claim on upgrades to piping, boiler and flare facilities in a major international oil refinery.
On behalf of an owner, analyzed delays and project management performance deficiencies in defense of a $40 million claim of an EPC contractor. The claim involved additional overhead and fee on a cost reimbursable contract for the management of the design and construction of an LNG terminal project that was delayed over 18 months. Analyzed deficiencies in the EPC contractor’s schedules and analyzed concurrent delays. Prepared the basis of a counterclaim by the owner against the EPC contractor.
Our experts are ready to help.
Our extensive international experience includes large, complex, grass roots, revamp, and reconstruction projects incorporating conventional-phased, fast-track, and EPC turnkey concepts.