On behalf of an insurance carrier, prepared an expert report for a case before the Superior Court of Ontario pertaining to the cost of construction to complete a residence in Metcalfe, Ontario, Canada. Reviewed, analyzed, and commented on the plaintiff’s expert report. Developed an estimated construction cost analysis for the scope of work presented by plaintiff’s expert. Opined on whether individual scopes of work provided by the plaintiff were a part of the completion of the house or an enhancement of the house.

Building Construction

Ontario, Canada

On behalf of an insurance carrier, prepared an expert report for a case before the Superior Court of Ontario pertaining to the cost of construction to complete a residence in Metcalfe, Ontario, Canada. Reviewed, analyzed, and commented on the plaintiff’s expert report. Developed an estimated construction cost analysis for the scope of work presented by plaintiff’s expert. Opined on whether individual scopes of work provided by the plaintiff were a part of the completion of the house or an enhancement of the house.

Power

Ontario, Canada

Assisted an owner in performing its due diligence of cost estimates and schedules by: (a) validating that the estimations of asset management costs were based on a “Class 2” estimate as defined by the Association of Advancement of Cost Engineering International (AACEI) and (b) reviewing refurbishment schedules to ensure that there were no contingencies in the integrated base schedule.

Power

Ontario, Canada

On behalf of the Ontario Provincial Government, evaluated delays to the restart of a power plant unit at a nuclear power electricity generation station located in northwest Ontario. The operator of the nuclear unit suffered a force majeure outage and, as a result, was entitled to balancing payments from the Ontario Government while the unit was being repaired and restarted. The provincial government was concerned that the delays that the unit operator experienced were excessively long. Evaluated whether the operator managed the unit’s outage schedule in the most efficient manner.

CONTACT US

Experience Matters

Our experts are ready to help.

Our extensive international experience includes large, complex, grass roots, revamp, and reconstruction projects incorporating conventional-phased, fast-track, and EPC turnkey concepts.