On behalf of an owner, analyzed a mechanical contractor’s $7 million marine lien delay and disruption claim against a major oil company on an offshore oil production project. The claim involved the value of equipment, piping, and structural installations on two refurbished rigs.

Offshore Oil and Gas

Texas

On behalf of an owner, analyzed a mechanical contractor’s $7 million marine lien delay and disruption claim against a major oil company on an offshore oil production project. The claim involved the value of equipment, piping, and structural installations on two refurbished rigs.

Refineries, Petrochemical, and Chemical

Texas

Prepared damages and schedule analyses in support of an owner’s defense against a contractor’s $5 million delay and disruption claim on a fast-track CO2 recovery process plant facility.

Industrial and Manufacturing

Texas

Assisted a supplier of proprietary equipment in defending against a $20 million claim on a project involving the design, delivery and construction of a new cement production line from ore receiving to clinker storage and loadout. The general contractor claimed for increased costs allegedly due to delays, disruption and labor impact arising from late delivery of design data and proprietary equipment, and a defective design. The case was arbitrated in Texas. The client was found liable for only a portion of disputed extra work.

Refineries, Petrochemical, and Chemical

Texas

On behalf of an owner, analyzed a $500 million property damage and business interruption claim resulting from fire damage to a petrochemical plant. Prepared cost estimates for the property damage claim and schedule analyses considering acceleration, betterments, upgrades, and non-rebuilt facilities.

Building Construction

Texas

Provided litigation support for the construction cost overruns and delays for several commercial building projects including a luxury hotel and a major office building.

Refineries, Petrochemical, and Chemical

Texas

On behalf of an EPC contractor, analyzed delays and time extension entitlement on a $75 million claim by the mechanical subcontractor involving the procurement materials and installation of process plant equipment and piping on a major petrochemical plant.